Townsville City Plan - Version 2015/01
Effective from: 28 August 2015Listed below are the Parts, Schedules and Appendices that form the Townsville City Plan - Version 2015/01, adopted 28 July 2015 and effective 28 August 2015.
For ease of selection and to minimise the impact of downloading the Townsville City Plan to PDF, the Townsville City Plan has been divided into smaller printable sections. To view and print a PDF copy of each section, click on each section listed below.
- Cover and index
- Citation and commencement
- Part 1 About the planning scheme
- Part 2 State planning provisions
- Part 3 Strategic framework
- Part 4 Priority infrastructure plan
- Part 5 Tables of assessment
- Part 6 Zones
- 6.2 Residential Zones
- 6.3 Centre zone category
- 6.4 Community facilities and open space zone category
- 6.5 Industry zones category
- 6.6 Rural zones category
- 6.7 Other zones category
- Part 7 Local plans
- Part 8 Overlays
- 8.2 Overlay codes
- 8.2.1 Airport environs overlay code
- 8.2.2 Bushfire hazard overly code
- 8.2.3 Coastal protection overlay code
- 8.2.4 Cultural heritage overlay code
- 8.2.5 Extractive resources overlay code
- 8.2.6 Flood hazard overlay code
- 8.2.7 Landslide hazard overlay code
- 8.2.8 Natural assets overlay code
- 8.2.9 Water resource catchment overlay code
- 8.2 Overlay codes
- Part 9 Development codes
- 9.2 Statewide codes
- 9.3 Use codes
- 9.4 Other development codes
- Part 10 Other plans
- Schedule 1 Definitions
- Schedule 2 Mapping
- Schedule 3 Priority infrastructure plan mapping ans supporting material
- Schedule 4 Notations required under the Sustainable Planning Act 2009
- Schedule 5 Land designated for community infrastructure
- Schedule 6 Planning scheme policies
- SC6.1 Planning scheme policy index
- SC6.2 Character residential planning scheme policy
- SC6.3 Cultural heritage planning scheme policy
- SC6.4 Development manual planning scheme policy
- SC6.4.1 Introduction
- SC6.4.2 Development application guidelines
- SC6.4.3 Design standards
- SC6.4.3.2 Building over or adjacent to services
- SC6.4.3.3 Footpath treatment policy
- SC6.4.3.4 Outdoor dining design
- SC6.4.3.5 Car parking and public transport facilities guidelines
- SC6.4.3.6 Landscape policy
- SC6.4.3.7 Steep land development design guidelines
- SC6.4.3.8 Stormwater management plans for development
- SC6.4.3.9 Water sensitive urban desing guidelines
- SC6.4.3.10 On-site sewerage facilities
- SC6.4.3.11 On-site water supply
- SC6.4.3.12 Constructed lakes
- SC6.4.3.13 Townsville road hierarchy
- SC6.4.3.14 Traffic impact assessment guidelines
- SC6.4.3.15 Noise and vibration assessment guidelines
- SC6.4.3.16 Rear lane design
- SC6.4.3.17 Driveways
- SC6.4.3.18 Geotechnical investigations
- SC6.4.3.19 Road and street naming
- SC6.4.3.20 Public lighting and utility services
- SC6.4.3.21 Townsville Water planning and design guidelines
- SC6.4.3.22 Waste management guidelines
- SC6.4.3.23 Water and sewer network modelling guidelines
- SC6.4.4 Design specification and standard drawings
- SC6.4.5 Constructuion management
- SC6.4.6 Construction standards
- SC6.4.7 Acceptance of completed works
- SC6.5 Economic impact assessment planning scheme policy
- SC6.6 Emerging community planning scheme policy
- SC6.7 Flood hazard planning scheme policy
- SC6.8 Mitigation bushfire hazard planning scheme policy
- SC6.9 Natural assets planning scheme policy
- SC6.10 Parking rates planning scheme policy
- Schedule 7 Places of cultural heritage value
- Appendix 1 Index and glossary of abbreviations and acronyms
- Apendix 2 Table of amendments