Print the Townsville City Plan
Listed below are the Parts, Schedules and Appendices that form the Townsville City Plan(Version 2024 / 01), adopted on 4th September 2024 and in effect on 4th November 2024. For ease of selection and to minimise the impact of downloading the Townsville City Plan to PDF, the Townsville City Plan has been divided into smaller printable sections. To view and print a PDF copy of each section, click on each section listed below.
- Cover and index
- Citation and commencement
- Part 1 About the planning scheme
- Part 2 State planning provisions
- Part 3 Strategic framework
- Part 4 Local government infrastructure plan
- Part 5 Tables of assessment
- Part 6 Zones
- Part 7 Local plans
- Part 8 Overlays
- Part 9 Development codes
- Part 10 Other plans
- Schedule 1 Definitions
- Schedule 2 Mapping
- Schedule 3 Local government infrastructure plan mapping and supporting material
- Schedule 4 Notations required under the Planning Act 2016
- Schedule 5 Land designated for community infrastructure
- Schedule 6 Planning scheme policies
- SC6.1 Planning scheme policy index
- SC6.2 Character residential planning scheme policy
- SC6.3 Cultural heritage planning scheme policy
- SC6.4 Development manual planning scheme policy
- SC6.4.1 Introduction
- SC6.4.2 Development application guidelines
- SC6.4.3 Standard Drawings
- SC6.4.4 Active Transport Infrastructure
- SC6.4.5 Road Network Infrastructure
- SC6.4.6 Road works and Traffic Control
- SC6.4.7 Clearing, Grubbing and Earthworks
- SC6.4.8 Stormwater Management
- SC6.4.9 Stormwater Quantity
- SC6.4.10 Stormwater Quality
- SC6.4.11 Water and Sewerage
- SC6.4.12 Landscaping and Open Space
- SC6.4.13 Irrigation
- SC6.4.14 Public Utilities and Building Over Near Services
- SC6.4.15 Steep Land Development
- SC6.4.16 Geotechnical Investigations
- SC6.4.17 Structures
- SC6.4.18 Concrete Works
- SC6.4.19 Noise and Vibration
- SC6.4.20 Outdoor Dining
- SC6.4.21 Rear Lanes
- SC6.4.22 Waste Management
- SC6.4.23 Construction Management Quality Management Inspection and Testing
- SC6.4.24 Acceptance of Completed Works
- SC6.5 Economic impact assessment planning scheme policy
- SC6.6 Emerging community planning scheme policy
- SC6.7 Flood hazard planning scheme policy
- SC6.8 Mitigating bushfire hazard planning scheme policy
- SC6.9 Natural assets planning scheme policy
- SC6.10 Parking rates planning scheme policy
- Schedule 7 Places of cultural heritage value
- Appendix 1 Index and glossary of abbreviations and acronyms
- Appendix 2 Table of amendments